Renewable Gas Plant

The customer required an evaluation of the geotechnical report to determine if helical piles were a viable foundation solution for a renewable gas plant. HELICOR’s engineering team reviewed the report and provided preliminary pile specifications. A test installation was performed, which confirmed feasibility, leading to the full-scale design and phased execution of 600 helical piles.

Greenfield Compressor Station

HELICOR was contracted to provide engineering services for the helical pile foundations and structural steel design of a new compressor station. The team validated the feasibility of helical piles for the site, procured materials, and installed 125 piles, completing the project ahead of schedule.